While Kevin has been on holidays he has continued with renovations. He reinstalled the railing by the side door, replaced floor boards on the deck, finished the deck railing and started the backsplash in the kitchen. We were waiting for the mortar to dry so hopefully we will grout the tiles tomorrow.
Showing posts with label renovations. Show all posts
Showing posts with label renovations. Show all posts
Sunday, August 5, 2007
Renovations continued...
While Kevin has been on holidays he has continued with renovations. He reinstalled the railing by the side door, replaced floor boards on the deck, finished the deck railing and started the backsplash in the kitchen. We were waiting for the mortar to dry so hopefully we will grout the tiles tomorrow.
Monday, July 9, 2007
More Basil photos
Subscribe to:
Posts (Atom)